/BMW_F900XR_profile_pic.jpg)
There is a vacuum pipe from the inlet tract to the EVAP system. You can read more about the EVAP System and identifying the correct vacuum pipe here. Cut this pipe and insert the 6mm Tee connector. Push the vacuum damper onto the third leg of the Tee connector.



The reservoir can be mounted under the seat or on a frame spar. Ensure that the top of the reservoir is at least slightly raised (ideally above 15° from horizontal) to maximise the available range.
Micro RMV shown.
Standard RMV shown./Scottoiler-xSystem-BMW_F900XR_1.jpg)
Once fitted, fill and prime the system and set the adjuster knob to ’prime’. Start the engine and turn the adjuster knob until a flow of between 1 and 2 drops per minute is achieved. Check the condition of your chain after a ride, and then adjust as required.
For best results clean your chain before fitting the Scottoiler using paraffin or similar. Then lightly oil the chain from the bottle using a rag or a brush, this allows the oil from the Scottoiler to reach both sides of the chain. 1 to 2 drops per minute will maintain this film of oil on the chain.

The xSystem chain oiler is really easy to install and can be mounted on your bike in less than 1 hour. The installation consists of the three simple steps:
For an example of the installation see our xSystem Installation guide.
If you have our system installed on this specific motorcycle model, we would appreciate if you could send us pictures. With more pictures we can make the Installation even easier for all motorcyclists. Please send us your feedback and photos to technical@scottoiler.com.
xSystem location suggestion.
Route Delivery Tubing


Scorpion Dual Injector
/71E8C635-5703-40B7-A836-540CC6FFC403.jpeg)
The eSystem chain oiler is really easy to install and can be mounted on your bike in less than 1 hour. The installation consists of the three simple steps:
For an example of the installation see our eSystem v3.1 Fitting Instructions.
If you have our system installed on this specific motorcycle model, we would appreciate if you could send us pictures. With more pictures we can make the Installation even easier for all motorcyclists. Please send us your feedback and photos to technical@scottoiler.com.
/20211027_114913.jpg)
Note; when positioning the reservoir make sure there is enough space left for suspension movement.
/20211027_114821.jpg)
/20211027_114851.jpg)
Article Number: 575
Author: Oct 14, 2020
Last Updated: Oct 31, 2025
Online URL: https://marketingengineer.de/article/f900r-f900xr-2019->-575.html